SR 7 and Orange Drive
     
Existing Condition: Currently, the only street accesses between the industrial district and SR 7 occur at Oakes Road and Orange Drive, which are approximately 3/4 of a mile apart. Businesses facing SR 7 between these streets can only be accessed from SR 7.
Build-Out Condition: The build-out condition calls for SR7, the new parallel street, and proposed public greens, to be faced by buildings that help delineate these streets and the proposed greens. The buildings will help define the street as an attractive public space by Maria DeLeon Fleites.